Preventive fence renewal construction method - List of Manufacturers, Suppliers, Companies and Products | IPROS

Preventive fence renewal construction method Product List

1~1 item / All 1 items

Displayed results

NETIS registered - Repair work for access prevention fence 'DON'T DIG method'

Renewal of the old access prevention fence! Utilizing existing posts, reducing construction time by over 50%.

The "DON'T DIG Method" allows for the installation of new poles without excavation by cutting and reusing part of the existing poles. It can be installed without being affected by the roots of trees and other vegetation in mountainous areas, and it does not generate industrial waste. It accommodates various pole shapes and does not require archaeological surveys for buried cultural properties. Additionally, since no digging is involved, it does not damage buried cables. 【Features】 ■ Utilizes existing poles for construction ■ Shorter construction period due to no excavation ■ No industrial waste generated ■ Not affected by the roots of trees and other vegetation ■ Compatible with various pole shapes *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Preventive fence renewal construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Preventive fence renewal construction method